Talk:SAR Wilmington (Basic): Difference between revisions
From TrainzOnline
Jump to navigationJump to search
Created page with "Track diagram of Wilmington on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) early 1960s prior to the arrival of the standard g..." |
mNo edit summary |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
Track diagram of Wilmington on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) early 1960s | Track and switch diagram of Wilmington on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. When the Broken Hill to Port Pirie line was converted to standard gauge in 1969, the Wilmington Line became an isolated narrow gauge branch line until it was closed in 1988. Wilmington was the terminus of the line. Created to support the TRS19 version layout. | ||
Latest revision as of 12:51, 14 November 2019
Track and switch diagram of Wilmington on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. When the Broken Hill to Port Pirie line was converted to standard gauge in 1969, the Wilmington Line became an isolated narrow gauge branch line until it was closed in 1988. Wilmington was the terminus of the line. Created to support the TRS19 version layout.