Talk:SAR Methuen (Basic): Difference between revisions
From TrainzOnline
Jump to navigationJump to search
mNo edit summary |
mNo edit summary |
||
| (One intermediate revision by the same user not shown) | |||
| Line 1: | Line 1: | ||
Track and switch diagram of Methuen on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) early 1960s | Track and switch diagram of Methuen on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. The Broken Hill to Port Pirie line was converted to standard gauge in 1969. Created to support the TRS19 version layout. | ||
Latest revision as of 03:03, 15 November 2019
Track and switch diagram of Methuen on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. The Broken Hill to Port Pirie line was converted to standard gauge in 1969. Created to support the TRS19 version layout.