|
|
| (One intermediate revision by the same user not shown) |
| Line 14: |
Line 14: |
| <table width=1000> <!-- BEGIN Summary table --> | | <table width=1000> <!-- BEGIN Summary table --> |
| <tr valign="top"> | | <tr valign="top"> |
| <td align="left">The '''Terowie Express''' from '''Adelaide''' has arrived on Platform 2. Passengers continuing onto '''Peterborough''' (with a connection to '''Broken Hill''' and '''Sydney'''), '''Quorn''' (with a connection to the <span style="color: white; background-color: black; font-weight: 700;"> Central Australia Line </span>) and '''Port Augusta''' (with a connection to the <span style="color: white; background-color: black; font-weight: 700;"> Trans Australia Line </span> service to '''Kalgoolie''' and '''Perth''') change trains here to the narrow gauge '''East-West Express''' service leaving from Platform 3.<br><br> | | <td align="left">The broad gauge '''Terowie Express''' from '''Adelaide''' has arrived on Platform 3. Passengers continuing onto '''Peterborough''' (with a connection to '''Broken Hill''' and '''Sydney'''), '''Quorn''' (with a connection to the <span style="color: white; background-color: black; font-weight: 700;"> Central Australia Line </span>) and '''Port Augusta''' (with a connection to the <span style="color: white; background-color: black; font-weight: 700;"> Trans Australia Line </span> service to '''Kalgoolie''' and '''Perth''') change trains here to the narrow gauge '''East-West Express''' service leaving from Platform 2.<br><br> |
| The loco must be watered and coaled at the <span style="color: white; background-color: black; font-weight: 700;"> Loco Depot </span> then turned and reattached to the front of the train for the return trip to '''Adelaide'''.</td> | | The loco must be watered and coaled at the <span style="color: white; background-color: black; font-weight: 700;"> Loco Depot </span> then turned and reattached to the front of the train for the return trip to '''Adelaide'''.</td> |
| <td align="right">[[file:BackToBottom.png|link=#bottom|alt=Bottom|Bottom]]</td> | | <td align="right">[[file:BackToBottom.png|link=#bottom|alt=Bottom|Bottom]]</td> |
| Line 61: |
Line 61: |
| </table> <!-- END Scenario image and loco/consist table --> | | </table> <!-- END Scenario image and loco/consist table --> |
|
| |
|
| <span style="font-weight: 700; font-size: 15px; color: white; background-color: black;"> Similar/Related Scenarios </span><br> | | <table width=1000> |
| | <tr valign="top"> |
| | <td><span style="font-weight: 700; font-size: 15px; color: white; background-color: black;"> DLS Session Based on This Scenario </span><br> |
| | <br> |
| | This is a fully directed session with '''Navigation Points''' and '''Message Popups'''. All junction switches will be set for you. |
| | <br> |
| | <span style="font-weight: 700;"><kuid:45176:109705> <span style="color: brown;">SAR Northern Division Terowie Broad Gauge Operations Session</span></span> - includes assembling a broad gauge freight train. |
| | <br></td> |
| | </tr> |
| | <tr valign="top"> |
| | <td><span style="font-weight: 700; font-size: 15px; color: white; background-color: black;"> Similar/Related Scenarios </span></td> |
| | </tr> |
| | </table> |
|
| |
|
| <table width=1000> | | <table width=1000> |
The broad gauge Terowie Express from Adelaide has arrived on Platform 3. Passengers continuing onto Peterborough (with a connection to Broken Hill and Sydney), Quorn (with a connection to the Central Australia Line ) and Port Augusta (with a connection to the Trans Australia Line service to Kalgoolie and Perth) change trains here to the narrow gauge East-West Express service leaving from Platform 2.
The loco must be watered and coaled at the Loco Depot then turned and reattached to the front of the train for the return trip to Adelaide. |
 |
|
When, Where and With What
 |
| Era: |
1930s |
| Duration: |
25 minutes |
| Loco: |
SAR 621 at Terowie Platform 2
Also available:-
SAR 752 at Terowie Station Loco Siding |
| Consist: |
Attached to SAR 621
- 4 SAR 700 class Broad Gauge coaches
|
|
|
DLS Session Based on This Scenario
This is a fully directed session with Navigation Points and Message Popups. All junction switches will be set for you.
<kuid:45176:109705> SAR Northern Division Terowie Broad Gauge Operations Session - includes assembling a broad gauge freight train.
|
| Similar/Related Scenarios |
|
|
Each location in the layout has a detailed set of track diagrams that provide a variety of useful information
The Getting Started guide below gives a summary of what is available.
To display this information click any graphic, or go to the bottom of the page for all the session links (all links will open in this window). |
Getting Started:
- Open the session SAR Northern Division Free Roam Session V2 into Trainz Driver. To do this:
- From the Driver/Surveyor loading screen select the route SAR Northern Division (Narrow Gauge) Route v2
- Then select VIEW SESSIONS
- Then select the session SAR Northern Division Free Roam Session V2
- Click DRIVE SESSION
- If you have already closed the opening message window then pause the session by pressing the P key.
- If you decide to set the session clock to a different starting time then follow the instructions shown in the Orders section
- Next locate your loco. Either:-
- Open the Finder Tool (press Ctrl F ) and type, in the Name field, the name of the loco, in this case SAR 621 (or just 621 which should be enough), then click the tick icon, OR
- Open the Driver List (bottom left of the screen) and then scroll through the list to find either:-
- the loco name (SAR 621) OR
- the driver icon (named Driver 621) - this is a non-animated icon
- then click the drivers Eye icon
to take control of the loco.
- Take a few moments to get your bearings. Click
(this link will open in this window) to show the location details and track plans for Terowie. In each location details page:-
- Each location details page has direct links to the adjacent locations so you can explore along the route.
- When you are ready to start, reload the Peterborough Base Session page (click the Scenarios button on your current location page) and select this Scenario again or just use the Back button on your browser - whichever is quicker.
- Close the opening message window if it is on the screen OR if Pause is shown on the screen instead, press the P key. Both actions will start the session.
|
|
Tutorial:
 |
A tutorial on using these scenarios is provided in the link on the left. The link will open in this window |
|
Orders:
- Uncouple the loco and tender from the passenger consist
- Proceed to the Coal & Water Stage Broad Gauge at the Loco Depot to load coal and water
- Turn the loco on the WYE (or Turning Triangle)
- Then either:-
- Couple the loco to the front of the train in preparation for the return express service to Adelaide, OR
- Stable SAR 621 in the depot shed. Attach loco SAR 752 to the front of the train in preparation for the return express service to Adelaide
|
 |
|
|
|
Driving Notes:
- The Broad Gauge Yard has no set track marks for AI commands. All switching is under manual control.
- Movements in the yard are restricted to 15 mph between the Station and the Depot and 10 mph at and beyond the Depot.
- You are responsible for correctly setting any catch points.
|
|
|
|
This page was created by Trainz user pware in May 2022 and was last updated as shown below.