Talk:SAR Black Rock (Basic): Difference between revisions
From TrainzOnline
Jump to navigationJump to search
mNo edit summary |
mNo edit summary |
||
| Line 1: | Line 1: | ||
Track and switch diagram of Black Rock on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) early 1960s | Track and switch diagram of Black Rock on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. When the Broken Hill to Port Pirie line was later converted to standard gauge, the Quorn Line became an isolated narrow gauge branch line until it was closed in 1988. Created to support the TRS19 version layout. | ||
Revision as of 02:43, 13 November 2019
Track and switch diagram of Black Rock on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. When the Broken Hill to Port Pirie line was later converted to standard gauge, the Quorn Line became an isolated narrow gauge branch line until it was closed in 1988. Created to support the TRS19 version layout.