Talk:SAR Gladstone (Basic): Difference between revisions
From TrainzOnline
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
Track and switch diagram (not all tracks and switches are shown) of Gladstone on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) | Track and switch diagram (not all tracks and switches are shown) of Gladstone on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. When the Broken Hill to Port Pirie line was converted to standard gauge in 1969, Gladstone became a triple gauge location and the Wilmington Line became an isolated narrow gauge branch line. The Wilmington and the broad gauge line to Adelaide were closed in 1988. Created to support the TRS19 version layout. | ||
Revision as of 12:40, 14 November 2019
Track and switch diagram (not all tracks and switches are shown) of Gladstone on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. When the Broken Hill to Port Pirie line was converted to standard gauge in 1969, Gladstone became a triple gauge location and the Wilmington Line became an isolated narrow gauge branch line. The Wilmington and the broad gauge line to Adelaide were closed in 1988. Created to support the TRS19 version layout.