SAR Peterborough-Terowie: Difference between revisions
From TrainzOnline
Jump to navigationJump to search
m added Wool to legend |
m added length data |
||
| Line 139: | Line 139: | ||
<span style="font-size: 20px; font-weight: 700;">Line History:</span><br><br> | <span style="font-size: 20px; font-weight: 700;">Line History:</span><br><br> | ||
<span style="font-weight: 700; background-color: black; color: white;">Opened: </span> 1881<br> | <span style="font-weight: 700; background-color: black; color: white;">Opened: </span> 1881<br> | ||
<span style="font-weight: 700; background-color: black; color: white;">Closed: </span> 1988<br><br> | <span style="font-weight: 700; background-color: black; color: white;">Closed: </span> 1988<br> | ||
<span style="font-weight: 700; background-color: black; color: white;">Length: </span> 23km<br><br> | |||
The broad gauge (5'3" - 1600mm) line from '''Adelaide''' to '''Terowie''' was built in stages from 1869 to 1880. The narrow gauge (3'6" - 1067mm) extension to '''Peterborough''' was completed in 1881. '''Terowie''' then became a major break-of-gauge location for | The broad gauge (5'3" - 1600mm) line from '''Adelaide''' to '''Terowie''' was built in stages from 1869 to 1880. The narrow gauge (3'6" - 1067mm) extension to '''Peterborough''' was completed in 1881. '''Terowie''' then became a major break-of-gauge location for freight and passenger traffic between '''Adelaide''' and the '''Transcontinental Railway'''.<br> | ||
After the conversion of the '''Port Pirie-Broken Hill Line''' to standard gauge (4'8.5" - 1435mm) | After the conversion of the '''Port Pirie-Broken Hill Line''' to standard gauge (4'8.5" - 1435mm) during 1969-1970 the line was converted to broad gauge in 1970 which transferred all break-of-gauge operations to '''Peterborough'''. | ||
The line was closed in 1988. | The broad gauge line was closed in 1988. | ||
</td> | </td> | ||
</tr> | </tr> | ||
</table> <!-- END Line History Table --> | </table> <!-- END Line History Table --> | ||
