SAR Scenario Paratoo Empty Ore: Difference between revisions
From TrainzOnline
Jump to navigationJump to search
mNo edit summary |
mNo edit summary |
||
| Line 64: | Line 64: | ||
<td><span style="font-size: 15px; font-weight: 700;">Task:</span></td> | <td><span style="font-size: 15px; font-weight: 700;">Task:</span></td> | ||
<td> | <td> | ||
# Run loco light engined from the depot to couple to the train. | # Run loco light engined from the depot to couple to the train on '''Yard 1'''. | ||
# Deliver wagons to '''Peterborough Loop''' or '''Peterborough Yard 1'''. | # Deliver wagons to '''Peterborough Loop''' or '''Peterborough Yard 1'''. | ||
# Coal and water the loco at the main depot or sub depot. | # Coal and water the loco at the main depot or sub depot. | ||
Revision as of 03:01, 18 February 2021
Gladstone to Peterborough Empty Ore
Gladstone to Paratoo Empty Ore
Moving empty ore wagons from Port Pirie to Broken Hill.
![]() |
|
|||||||||
| Duration: | Gladstone to Peterborough 1 hour 20 minutes Gladstone to Paratoo 2 hour 45 minutes |
| Loco: | SAR T 201 at Gladstone Depot Other Unrostered Locos:
|
| Consist: | 22 CCC gondola wagons, 1 DB Guard Van on Gladstone Yard 1 |
| Task: |
|
| Driving Notes: |
|

