SAR Hammond: Difference between revisions
From TrainzOnline
Jump to navigationJump to search
mNo edit summary |
mNo edit summary |
||
| Line 85: | Line 85: | ||
Passing/goods and station loops with a goods siding and loco watering facility. The original large wooden station building was demolished in 1959 and replaced by an unimpressive iron shed.<br> | Passing/goods and station loops with a goods siding and loco watering facility. The original large wooden station building was demolished in 1959 and replaced by an unimpressive iron shed.<br> | ||
'''Hammond''' was originally planned to be the commercial centre for the region | '''Hammond''' was originally planned to be the commercial centre for the region and was one of the sites selected for a proposed connection to the '''Wilmington Line''' but the population growth never reached the required level. By the time the line was closed '''Hammond''' was almost a ghost town.<br> | ||
The line from '''Eurelia''' to '''Quorn''' was closed in 1987 and most of the track was removed in 2008. Today the ghost town status of '''Hammond''' has not changed. | |||
</td> | </td> | ||
</tr> | </tr> | ||


