SAR Melrose: Difference between revisions
From TrainzOnline
Jump to navigationJump to search
mNo edit summary |
mNo edit summary |
||
| Line 1: | Line 1: | ||
<!-- V1.0 --> | |||
<table> <!-- BEGIN TOP TABLE --> | <table> <!-- BEGIN TOP TABLE --> | ||
<tr valign="top"> | <tr valign="top"> | ||
| Line 82: | Line 84: | ||
The '''Gladstone-Wilmington Line''' is '''unsignalled'''. Train Order working is in operation on the line.<br> | The '''Gladstone-Wilmington Line''' is '''unsignalled'''. Train Order working is in operation on the line.<br> | ||
There were no passenger services after 1969. The line was closed in 1990 and the track has since been removed. The right-of-way from '''Melrose''' to '''Wilmington''' has been converted into a rail trail. | There were no passenger services after 1969. The line was closed in 1990 and the track has since been removed. The right-of-way from '''Melrose''' to '''Wilmington''' has been converted into a rail trail. The site of the former '''Melrose''' station and yard has now been replaced by a large grain receiving facility. | ||
</td> | </td> | ||
</tr> | </tr> | ||
Revision as of 03:50, 24 June 2022


