SAR Gumbowie: Difference between revisions
From TrainzOnline
Jump to navigationJump to search
mNo edit summary |
mNo edit summary |
||
| Line 79: | Line 79: | ||
Passing and siding loops. A signal box and a small station building that were originally present on the main line had been removed by the start of the 1960s.<br> | Passing and siding loops. A signal box and a small station building that were originally present on the main line had been removed by the start of the 1960s.<br> | ||
The loop and siding were removed when the line was converted to broad gauge (5' 3", 1600mm) in 1970 | The loop and siding were removed when the line was converted to broad gauge (5' 3", 1600mm) in 1970. | ||
</td> | </td> | ||
</tr> | </tr> | ||


