Talk:SAR Peterborough: Difference between revisions
From TrainzOnline
Jump to navigationJump to search
No edit summary |
mNo edit summary |
||
| Line 1: | Line 1: | ||
Track and | Track diagram and other data for Peterborough on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. In 1969 the Broken Hill to Port Pirie line was converted to standard gauge and the the Terowie Line was converted to Irish broad gauge making the Quorn Line an isolated narrow gauge branch line until it and the Terowie Line were closed in 1988. Created to support the TRS19 version layout. | ||
Latest revision as of 01:30, 17 November 2021
Track diagram and other data for Peterborough on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. In 1969 the Broken Hill to Port Pirie line was converted to standard gauge and the the Terowie Line was converted to Irish broad gauge making the Quorn Line an isolated narrow gauge branch line until it and the Terowie Line were closed in 1988. Created to support the TRS19 version layout.