SAR Melrose: Difference between revisions
From TrainzOnline
Jump to navigationJump to search
mNo edit summary |
mNo edit summary |
||
| Line 86: | Line 86: | ||
The '''Gladstone-Wilmington Line''' is '''unsignalled'''. Train Order working is in operation on the line.<br> | The '''Gladstone-Wilmington Line''' is '''unsignalled'''. Train Order working is in operation on the line.<br> | ||
Passenger services ended in 1969. The line was closed in 1990 and the track has since been removed.<br> | |||
The right-of-way from '''Melrose''' to '''Wilmington''' has been converted into a rail trail. The site of the former '''Melrose''' station and yard is now occupied by a large grain receiving and storage facility. | |||
</td> | </td> | ||
</tr> | </tr> | ||
| Line 197: | Line 199: | ||
The '''Gladstone-Wilmington Line''' is '''unsignalled'''. Train Order working is in operation on the line.<br> | The '''Gladstone-Wilmington Line''' is '''unsignalled'''. Train Order working is in operation on the line.<br> | ||
Passenger services ended in 1969. The line was closed in 1990 and the track has since been removed.<br> | |||
The right-of-way from '''Melrose''' to '''Wilmington''' has been converted into a rail trail. The site of the former '''Melrose''' station and yard is now occupied by a large grain receiving and storage facility. The original yard crane is now on display with interpretive panels at the nearby Melrose Showgrounds. | |||
</td> | </td> | ||
</tr> | </tr> | ||


