| Gladstone to Peterborough Depot Fuel Run |
| Loco coal stages and fuel-oil points need to be refilled regularly. This service delivers coal to the loco coal stages at Jamestown and Peterborough, and bunker c oil (for the SAR 400 class Garrett locos) to the loco (main) depot at Peterborough. |
 |
 |
| Duration: |
2 hours |
| Loco: |
SAR T 258 on Gladstone Goods Loop
Other Unrostered Locos:
- SAR T 210 at Gladstone Depot
|
| Consist: |
Attached to SAR T 258. 5 CCC gondola wagons, 3 Tank wagons, 1 DB Guard Van. Each wagon has its destination as part of its name e.g. Bunker Tank Peterborough 3 indicating it is the 3rd tanker wagon for Peterborough. |
|

 |
Each location in the layout has a detailed set of track diagrams that provide a variety of information.
To display the data click any Line Index graphic, or go to the bottom of the page for all the session links (all links will open in this window). |
|
|
Tasks:
- Run the loco light engined to the Goods Loop Yard and couple to the train.
- Take the train to Jamestown and unload the Jamestown CCC (coal) wagon at the Loco Coal & Water Stage. Store the empty wagon on one of the Loco Depot Siding roads.
- Take the train to Peterborough and unload one of the Peterborough CCC (coal) wagons at the Sub Depot Loco Coal Stage and the remaining CCC wagons at the Main Depot Loco Coal & Water Stage. Store the empty coal wagons on one of the Loco Depot Siding roads.
- Unload the Tank wagons at the Main Depot Loco Fuel & Water Point. Store the empty Tank wagons on one of the Loco Depot Siding roads.
|
 |
|
|
This page was created by Trainz user pware in February 2021 and was last updated as shown below.